> connect waste and overflow to the drain system. > fill the bathtub with water. > make sure to water test fittings. > mark the holes for the brackets on > > clean area under bathtub. Thoroughly inspect the bath before installation.
> let it sit for 24 hours before draining. >set bathtub into designated frame > slide lifting straps under the bathtub. X x x > set bathtub into designated frame >connect waste and overflow to the > clean the bathtub. > fill the bathtub with water. Warning fatal injury by electric shock! Do not drop or hit the bath on hard objects. This quick and easy video guide walks you through the entire process, step by s. > connect waste and overflow to the drain system.
The freestanding bathtub will only drain properly if it is leveled.
Place the freestanding bathtub in the position you plan to install it. Do not push against the apron or stand ladders in the bath. This quick and easy video guide walks you through the entire process, step by s. Warning fatal injury by electric shock! > inspect for potential leaks. • ensure that the adjustable feet on the bathtub is level with the floor and the walls of the bathtub. > connect waste and overflow to the drain system. > secure bathtub by setting it onto the wall brackets. See how to connect the pipes and fittings to the ki. Report any damage to the supplier and request their advice on continuing installation. Our bathtub used special attachment clips, which we fastened with roofing nails driven just above the flange (photo 8). A few tricks and tips to make your bathroom installation a whole lot easier. Do not drop or hit the bath on hard objects.
Our bathtub used special attachment clips, which we fastened with roofing nails driven just above the flange (photo 8). Do not push against the apron or stand ladders in the bath. > secure bathtub by setting it onto the wall brackets. Report any damage to the supplier and request their advice on continuing installation. Do not drop or hit the bath on hard objects.
Then install the bathtub and anchor it to the wall studs as recommended by the manufacturer. A few tricks and tips to make your bathroom installation a whole lot easier. > let it sit for 24 hours before draining. Always remove shoes before standing in the bath. > inspect for potential leaks. This quick and easy video guide walks you through the entire process, step by s. Notice apply silicone recommended for mineral cast bathtubs only. Report any damage to the supplier and request their advice on continuing installation.
16.12.2013 · want to know how to install your beautiful new bathtub from bootz industries?
Warning fatal injury by electric shock! Notice apply silicone recommended for mineral cast bathtubs only. > inspect for potential leaks. X x x > set bathtub into designated frame >connect waste and overflow to the > clean the bathtub. > mark the holes for the brackets on > > clean area under bathtub. See how to connect the pipes and fittings to the ki. Then install the bathtub and anchor it to the wall studs as recommended by the manufacturer. > make sure to water test fittings. Report any damage to the supplier and request their advice on continuing installation. A few tricks and tips to make your bathroom installation a whole lot easier. Check the level of the floor. Thoroughly inspect the bath before installation. This quick and easy video guide walks you through the entire process, step by s.
Then install the bathtub and anchor it to the wall studs as recommended by the manufacturer. The freestanding bathtub will only drain properly if it is leveled. Always remove shoes before standing in the bath. Place the freestanding bathtub in the position you plan to install it. See how to connect the pipes and fittings to the ki.
This quick and easy video guide walks you through the entire process, step by s. X x x > set bathtub into designated frame >connect waste and overflow to the > clean the bathtub. Place the freestanding bathtub in the position you plan to install it. > secure bathtub by setting it onto the wall brackets. > inspect for potential leaks. Then install the bathtub and anchor it to the wall studs as recommended by the manufacturer. >set bathtub into designated frame > slide lifting straps under the bathtub. Report any damage to the supplier and request their advice on continuing installation.
> mark the holes for the brackets on > > clean area under bathtub.
> mark the holes for the brackets on > > clean area under bathtub. Notice apply silicone recommended for mineral cast bathtubs only. Report any damage to the supplier and request their advice on continuing installation. Do not drop or hit the bath on hard objects. > inspect for potential leaks. > secure bathtub by setting it onto the wall brackets. >set bathtub into designated frame > slide lifting straps under the bathtub. A few tricks and tips to make your bathroom installation a whole lot easier. The freestanding bathtub will only drain properly if it is leveled. > let it sit for 24 hours before draining. Thoroughly inspect the bath before installation. Warning fatal injury by electric shock! 16.12.2013 · want to know how to install your beautiful new bathtub from bootz industries?
31+ Best Bathtub Installation Instructions : Archer tub by Kohler | Terry Love Plumbing & Remodel DIY : > secure bathtub by setting it onto the wall brackets.. • ensure that the adjustable feet on the bathtub is level with the floor and the walls of the bathtub. Always remove shoes before standing in the bath. >set bathtub into designated frame > slide lifting straps under the bathtub. > let it sit for 24 hours before draining. Report any damage to the supplier and request their advice on continuing installation.